+ (371) 207 17 177

e-mail: moc.baferpb2b%40ofni

Preguntas frecuentes (FAQ)

¿Tienes preguntas sobre nuestras soluciones prefabricadas, plazos de producción, logística o instalación? Estás en el lugar correcto. Hemos recopilado respuestas a las preguntas más comunes de nuestros clientes y socios para ayudarte a comprender mejor cómo funciona B2B Prefab.

Si no encuentras lo que buscas, no dudes en contactarnos directamente — nuestro equipo siempre está listo para ayudarte.

🏢 About the Company

  • We are an international company specializing in the design, production, delivery, and installation of energy-efficient prefabricated structures for residential and commercial projects across Europe.

  • Our headquarters are located in Latvia. Our production and constructions partners are in Germany, Netherlands, Ukraine, Slovenia and Poland.

  • Our primary focus is B2B — developers, architects, and construction companies. However, we also work with individual private clients (B2C).

  • We carry out projects in Germany, the Baltic states, Austria, France, the Netherlands, Poland, Czech Republic, Ukraine, and other European countries.

📦 Logistics & Delivery

  • Yes, we organize full logistics from the factory to the construction site.

  • MEGA trailers, standard trucks, and high-capacity trailer combinations.

  • Typically between 5 and 10 working days after production completion.

  • A ready foundation, accessible road for large trucks, and space for a crane or lifting equipment.

🏗 Products & Technology

  • ● Private houses
    ● Apartment buildings
    ● Offices, hotels, restaurants
    ● Social infrastructure: schools, kindergartens, care centers, and more

  • Timber frame wall panels, facade systems, floor structures, roof trusses, modular units (bathrooms, kitchens), windows, doors, sun protection systems, and more.

  • At factories in Poland, Ukraine and Slovenia, using CE-certified European materials.

  • Yes, all our structures comply with EN standards and hold CE certification.

  • Thermal resistance up to 0.10 W/m²K — meeting Passive House standards.

  • From 240 to 500 mm, depending on the project and insulation requirements.

  • Yes, the systems are designed with pre-planned integration zones for HVAC, solar panels, and other equipment, including load-bearing considerations.

  • Over 100 years with proper maintenance and timely renovation.

  • Yes, our technology is highly earthquake-resistant and can be adapted to meet local seismic codes.

  • Fire protection up to REI120 is achievable depending on the design and finishing layers.

🔧 Installation

  • Our B2B Prefab assembling teams or certified regional partners.

  • How long does installation take?
    ● Up to 200 m²: 3–10 days
    ● 900 m² buildings: approx. 3–4 weeks
    Depends on project complexity and weather conditions.

  • Yes, a crane or long-arm manipulator is necessary for installation.

  • It depends on the contract. We offer two options:
    – Full installation by our crews or partners
    – Client-led installation with mandatory supervision by our representative (to maintain warranty)

  • Yes, every set is delivered with detailed installation documentation. On-site supervision is mandatory to ensure quality and warranty compliance.