+ (371) 207 17 177

e-mail: moc.baferpb2b%40ofni

Frequently Asked Questions (FAQ)

Have questions about our prefab solutions, production timelines, logistics, or installation? You’re in the right place. We’ve gathered answers to the most common questions from our clients and partners to help you better understand how B2B Prefab works.If you don’t find what you’re looking for, feel free to contact us directly — our team is always ready to assist you.

🏢 About the Company

  • We are an international company specializing in the design, production, delivery, and installation of energy-efficient prefabricated structures for residential and commercial projects across Europe.

  • Our headquarters are located in Latvia. Our production and constructions partners are in Germany, Netherlands, Ukraine, Slovenia and Poland.

  • Our primary focus is B2B — developers, architects, and construction companies. However, we also work with individual private clients (B2C).

  • We carry out projects in Germany, the Baltic states, Austria, France, the Netherlands, Poland, Czech Republic, Ukraine, and other European countries.

📦 Logistics & Delivery

  • Yes, we organize full logistics from the factory to the construction site.

  • MEGA trailers, standard trucks, and high-capacity trailer combinations.

  • Typically between 5 and 10 working days after production completion.

  • A ready foundation, accessible road for large trucks, and space for a crane or lifting equipment.

🏗 Products & Technology

  • ● Private houses
    ● Apartment buildings
    ● Offices, hotels, restaurants
    ● Social infrastructure: schools, kindergartens, care centers, and more

  • Timber frame wall panels, facade systems, floor structures, roof trusses, modular units (bathrooms, kitchens), windows, doors, sun protection systems, and more.

  • At factories in Poland, Ukraine and Slovenia, using CE-certified European materials.

  • Yes, all our structures comply with EN standards and hold CE certification.

  • Thermal resistance up to 0.10 W/m²K — meeting Passive House standards.

  • From 240 to 500 mm, depending on the project and insulation requirements.

  • Yes, the systems are designed with pre-planned integration zones for HVAC, solar panels, and other equipment, including load-bearing considerations.

  • Over 100 years with proper maintenance and timely renovation.

  • Yes, our technology is highly earthquake-resistant and can be adapted to meet local seismic codes.

  • Fire protection up to REI120 is achievable depending on the design and finishing layers.

🔧 Installation

  • Our B2B Prefab assembling teams or certified regional partners.

  • How long does installation take?
    ● Up to 200 m²: 3–10 days
    ● 900 m² buildings: approx. 3–4 weeks
    Depends on project complexity and weather conditions.

  • Yes, a crane or long-arm manipulator is necessary for installation.

  • It depends on the contract. We offer two options:
    – Full installation by our crews or partners
    – Client-led installation with mandatory supervision by our representative (to maintain warranty)

  • Yes, every set is delivered with detailed installation documentation. On-site supervision is mandatory to ensure quality and warranty compliance.